How to Add Sub-Targets from the Card View
Purpose
Sub-targets allow teams to break down a Key Result into smaller, trackable components that provide clearer insight into progress, accountability, and performance drivers. By using sub-targets, organizations can move beyond a single aggregated metric and understand how results are achieved, not just whether they are achieved.
This capability ensures that progress is:
- Measurable at a granular level
- Transparent across contributors
-
Consistently calculated across the platform
Business Case
As organizations scale, Key Results often depend on multiple inputs, systems, or workstreams. Tracking all progress at a single Key Result level can hide risk, delay corrective action, and reduce accountability.
Sub-targets solve this by enabling:
-
Granular accountability
Different owners can be responsible for different sub-targets while still contributing to one Key Result. -
More accurate progress calculations
Each sub-target can have its own formula, baseline behavior, update direction, and cadence. -
Better decision-making
Leaders can quickly see which part of a Key Result is ahead, behind, or blocked. -
Auditability and traceability
Internal IDs, sources, formulas, and ownership provide a clear data trail for governance and reporting. -
Scalability
Sub-targets support complex outcomes without requiring separate Key Results for every metric.
Overview
Sub-targets are configured from within a Key Result’s Card View. They live in the View Details panel and contribute directly to the Key Result’s overall progress based on the rules defined by your organization.
Each sub-target can be fully customized with:
- Its own calculation logic
- Update rules and frequency
- Direction of progress (increasing or decreasing)
- Baseline handling
- Ownership and data source
- Unique internal identification
How to Add a Sub-Target from the Card View
Step 1: Open the Card
Navigate to the card that contains the Key Result where you want to add a sub-target.
Step 2: Open Key Result Details
- Under the Key Result, click the ellipsis (⋯)
-
Select View Details
This opens the detailed configuration panel for the Key Result.
Step 3: Locate the Sub-Targets Section
Within View Details, scroll to the Sub-Targets section. This is where all sub-targets are created, edited, and managed.
Sub-Target Configuration Details
When adding or editing a sub-target, the following fields are available.
1. Description
- Clearly defines what the sub-target measures
- Should explain why the metric exists and what success looks like
- Recommended to include units, thresholds, or contextual notes
Example:
“Average response time for customer support tickets during business hours”
2. Formula
Defines how the sub-target value is calculated
Can be manual or system-driven depending on configuration
Ensures consistent calculation across reporting, dashboards, and exports
Best practice:
Use formulas that are simple, repeatable, and easily understood by stakeholders.
3. Source
Identifies where the data comes from
Examples include:
- Internal systems
- External tools
- Reports
- Manual entry
This improves transparency and trust in the data.
4. Owner
- Assigns responsibility for maintaining and updating the sub-target
- Owners are accountable for data accuracy and timeliness
- Ownership can differ from the Key Result owner
5. Frequency
Determines how often the sub-target should be updated
Common options include:
- Daily
- Weekly
- Monthly
- Quarterly
This helps align expectations and reporting cadence.
6. Update Behavior
- Defines how updates occur
- Supports alignment with operational rhythms and reporting cycles
7. Direction of Progress
Specifies how success is measured:
-
Increasing
Higher values indicate improvement
(revenue, adoption rate, completion percentage) -
Decreasing
Lower values indicate improvement
(defect count, response time, error rate)
This ensures progress is interpreted correctly across dashboards.
8. Baseline Handling
You can choose whether the baseline should be:
-
Included
Progress is measured relative to the starting point -
Ignored
Baseline is excluded from progress calculations
This is critical for ensuring accurate progress tracking depending on the metric type.
9. Internal ID
Assigns a unique identifier to the sub-target
Used for:
- Reporting
- Integrations
- Auditing
- Data consistency across environments
For more information about how Internal IDs are generated, displayed, and used throughout the platform, see Internal IDs for Key Results.
Important:
Each Key Result and each sub-target should have its own Internal ID to avoid ambiguity.
How Sub-Targets Impact Progress
Once configured and saved:
- Sub-targets contribute to the Key Result’s overall progress
- Calculations respect direction, baseline rules, and formulas
- Progress rolls up into dashboards, reports, and exports
This ensures the Key Result reflects real, structured progress rather than a single flat value.
When to Use Sub-Targets
Sub-targets are ideal when:
- A Key Result depends on multiple contributing metrics
- Work is distributed across teams or owners
- Progress needs deeper visibility
- Precision and governance are required
Outcome
By using sub-targets, teams gain:
- Clear visibility into progress drivers
- Stronger accountability at every level
- More trustworthy and explainable metrics
- Scalable tracking for complex outcomes
Sub-targets turnkey Results into actionable, transparent performance systems - without losing alignment to the bigger goal.
Summary
Think of Sub-targets as the steppingstones that lead to your biggest achievements. Instead of waiting until the finish line to see if you've succeeded, Sub-targets let you celebrate progress along the way, identify roadblocks early, and keep every contributor moving in the right direction.
The more thoughtfully you design your Sub-targets, the clearer your path to success becomes. Small milestones today lead to big outcomes tomorrow!